
Successfully completed the full cycle Multi core Installation (Hydraulic Tubing, Valve Remote Control), Complete Pilot Piping Installation (Framo) on ships which include MT-46 Product Tanker, MT-50 Product Tankers, Liberty Class MT-115 Aframax Tanker , and CV3600-TEU Series Ship. Hydraulic tubing connections from cabinet goes through emergency block assembly to the…
Complete Installation of CO2 Tubing on CV3600-TEU Series Ships. CO2 Tubing- Stainless steel tubing runs inside passageway stbd and port sides from CO2 manifold to each cargo tanks. Connecting and bending tubes installed according to requirements and high-pressure testing standards

Successfully completed Steel Fabrication and Hot Outfitting on MT-50 Product Tanker Longitudinal and Transverse Bulkheads.

Successfully completed Steel Fabrication and Hot Outfitting and related Lower Stools on MT-50 Class Tanker.

Assemble and weld modular sections weighing in excess of 700MT for dock erections on CV3600-TEU Series Ship

Preparation of cargo pipe ( Stainless Steel 316L Sch 10) spools including targets and associated pipe supports. Weld all the weld joints in preparation for the pressure testing and instillation as specified by the customer. We coordinate visual inspection of cargo pipe welds and Non-destructive testing.